Huy Hoang Steel is expert in the Design-Build parallax Public - The ThepTien Fitting Manufacturing

Huy Hoang Company specializing in Construction, Installation Execution Factory - Prefabricated Building includes the following categories:

Huy Hoang Steel is expert in the Design-Build parallax Co. - Installation Factory - Home ThepTien Finished

Huy Hoang Company specializes Execution Installation Factory - Prefabricated Building includes the following categories:

     1. Construction Company Huy Hoang Thi Cong Steel Factory

     The company specializes in design, construction, Execution Factory - Huy Hoang Steel Prefabricated Building Units are proud to be the lowest cost in the construction industry with the scale of the factory - pre-engineered steel buildings. Our company always assure our customers of the production capacity of our construction based on the enhancement of advanced scientific applications and processes to help stabilize the company always assured of competitive prices lowest competitive and best quality.

     The company is an effective solution and savings for customers by optimizing capabilities by creating more floor space added to the rare.

     2. The history of the construction of the factory - pre-engineered steel buildings

     Began in the United States in the second half of the 20th century is considered as a new type of steel frames for the industry, with this type are used exclusively for agricultural areas to store grain and hay to feed cattle in the America and European countries.

     Before coming to Vietnam, the type as "Execution Factory - prefabricated houses" usually only used as structural triangular truss frame also called Czechoslovakia. The biggest turning point for Vietnam is opening to foreign countries into the Zamil - registered business in Saudi Arabi and this is the first time putting this welded steel frame cut into construction so engineers usually call Zamil frame. Zamil Steel fact just a specialized company making prefabricated steel buildings, but not the bodies Zamil set the standard by which the name is incorrect Zamil frame which must called frame (steel) Pre (Pre -engineering Building-PEB).

     And because this technology is not technology copyright, so only a few years later, the small mechanical workshop domestic large frame format also do this, so just cut welding is, it is relatively easy due material savings, rapid erection. Now almost 97% are used workshop frames This frame format.

     In the design, the construction of the factory's engineers qualified Vietnam, it is not too bad, but the ability to relink, organizational ability, the ability to make the poor economy. Special ability to retain credibility with customers Vietnam compact low. So there is no foothold dare not say the names confirmed. But for Huy Hoang Steel Company we are always committed to ensuring our customers always with a team of construction and professional quality.

     3. Introduction of factory construction - prefabricated houses

     Currently, with the development of the economy increased, leading to a lot of diverse service needs and entail higher commodity storage. To accommodate the increasing production, the construction elements factory construction elements being considered the best deal in the current manufacturing process. To ensure the production process is effective and high quality construction, the factory have done well on the production line as well as the progress of the construction of the factory.

      When construction of the factory just a few clicks we can create a truly complete projects, thereby reducing construction time while working on the construction site as well as help reduce the construction schedule in order to complete the work soon. At the same time investors can easily manage quality control works right from the production process.

4. Advantages of factory construction - prefabricated houses

Low cost.
Fast construction time.
Low maintenance costs.
Easily extended in the future for businesses.
Prefabricated steel lighter weight than other materials should help to reduce the load applied.
Easily save the filler material (compared to traditional fixed).
Is making the most of the factory space.
Very high uniformity.
Easily scaling.
Reduce the decline, less expensive money.
Especially with prefabricated steel building will be a good water technology by using the standing seam roof, roof components stand and point the roof.
    5. The basic steps for construction of workshop

     Step 1: Stage design workshop facility

Introduction location details, plans for construction design, general construction of premises or the construction plans in lines such as: location, size and construction, for the construction preparation. At the same time to know the combined grades of project works and the infrastructure ...
Technological schemes, line technology applicable for works requested or required under GMP for construction design workshop ...
Architectural plans for the building are architectural requirements such as offices, workshops protection ...
The plan of the main structure, systems and technical infrastructure works mainly for the construction of factories.
Optimal scheme of environmental regulations, fire prevention and fighting according to regulations of the industrial park or industrial complex when we design workshops ...
The standards and regulations are applied mainly during the construction design workshop.
     Step 2: Design the technical construction file factory

There must be a drawing describing the total ground construction works or drawings need to plan the work line is constructed in lines.
Required technological diagrams or line drawings technologies for buildings with technological requirements of each workshop.
With drawing architectural plans for projects with architectural requirements.
With the printing drawings with the main structural system and technical infrastructure is mainly of the construction, as well as connecting with the technical infrastructure of the area.
     Step 3: Enter the construction drawing design workshops

Disclosures are included as design, design drawings or documents on construction survey concerning construction of the facility cost estimates.
Should ensure full technical information, materials used and detailed structure matching criteria apply. Design drawings must be fully qualified to carry out the construction works.
     Also we can refer to the steps to build prefabricated steel buildings to know more of other types of construction.

     6. Note the factory construction - prefabricated houses

     Things to keep in mind during the construction of plant and factory construction supervision:

When our factory construction should pay attention to the foundation of the factory because it is considered an important part of the workshop. We can see the foundation and background will greatly affect the quality of the work or construction costs.
With a factory located on the terrain hard ground or against the background of high building construction, when we will not need foundation reinforced foundations such as pile or piles of Melaleuca. Conversely, if we constructed immediately lands soft, soft soil, silt, the reinforced part is very important foundation for the building workshops.
For painted floor, at the request of the user, but the construction company and design factory rational layout. In addition, the workshop concreting section on the thickness of 10 to 60cm is extremely important because it is based on the book that the construction machinery and equipment manufacturer with a load of up to several dozen tonnes / m2.
When finished concrete floor they need to conduct workshops epoxy paint on concrete surfaces against dust or easy cleaning and hygiene ...
Note the steel columns and steel truss section of the factory, we have to design a layout just right to avoid shortage or surplus steel. By the standards of conventional design workshops often seen as every 1m 20 to 32kg depending on the size of the steel plant and the level of financial investment.
It is also important to note that the construction of the team skilled mechanic erection truss frame factory, the construction bricklayer background, foundation, walls factory. But it is our firm commitment to the customer will have one professional construction team and effectively.
     In a nutshell the building construction from our factory according to the above steps as summarized below: Construction nail factory, original wallpaper, leveling and compacting the background, steel column factory built truss erection truss frame roofing, building walls, painted floor concreting, installation of lighting equipment, epoxy ....

     To be offered the best solution for factories, warehouses and production premises, please contact us to get accurate advice and practical.